Functional analysis, preparation of technical specifications | Whole study of all electrical circuits (AC and DC) to be approved by LLOYD’S Register London | Visit and repair of 80 kilowatts generators, 100 kilowatts ground current transformer | Realization of the main switchboard, distribution boards and cabinets for all systems (AC, cranes, desalination, bow thruster, steering gear, water treatment) | Realization of cable trays, cable laying | Unit tests and system tests
Project Management of Complete Systems during the refit of a motor yacht
![etude-de-cas-3](https://eye-yachts.com/wp-content/uploads/2023/02/etude-de-cas-3.jpg)